Call for FREE Quote

660-281-0410

THE DURALAST FLOOR COATING PROCESS

PREPARATION

DURALAST Floor Coatings Step 1 - grinder

Step 1: PREPARATION

The concrete is cleaned to remove any salt or oil residue by diamond grinding. All grinders are hooked up to vacuums to minimize dust.

DURALAST Floor Coatings Step 2 - repairing

Step 2: REPAIRING THE CONCRETE

Duralast crack filler is used to fill pits and cracks. Then the surface is ground off smooth with a grinder.

DURALAST Floor Coatings Step 3 - basecoat

Step 3: BASECOAT

Duralast’s self-priming 100% solids pure polyurea is applied to the floor

APPLICATION

DURALAST Floor Coatings Step 4 - Chips

Step 4: FULL BROADCASTING CHIPS

After an area has been basecoated, chips are thrown into the wet basecoat by hand putting color and texture into the floor

DURALAST Floor Coatings Step 5 - scraping the floor

Step 5: SCRAPING THE FLOOR

After the basecoat is dry, the floor is scraped with steel blades, then vacuumed to be sure there are no loose chips on the floor.

DURALAST Floor Coatings step 6 - Top Coat

Step 6: TOP COAT

The final step is to squeegee, then roll out the UV stable polyaspartic top coat.

Call Now ButtonCall Now!